FACILITIES
Works to be carried out in the Holidays
- New air con installed in music room
- Due to Workplace Health and Safety annual tree pruning is planned.
- H Block roof replacement.
- Repair flooring in Amenities 3
- Assorted roof inspections
- Whole school gutter clearing and inspections
Gates
Parents collecting students from after-school extracurricular activities are encouraged to use the self-closing gate through the nature garden. Other gates are generally locked after school, to ensure that students in OSHC are secure.
Kind regards,
Sahn McGaw
Business Manager